← Nigeria railway records
ABV

Abuja Nnamdi Azikiwe (ABV)

Limited suburban service

Recorded status: Operational

Awaiting verification. The recorded status and details may be historical. Check the operator’s current information before relying on this record.

Overview

There are two trains a day each way operating on the line between Abuja Central and its airport (the new terminal, opened in 2018). The fare is N 1000 (March 2020). The timetable is in https://www.abuja-airport.com/metro.php

Go further with IARO

Members can read the additional reference notes and explore planned schemes and cargo connections.

Explore membership → · Member login →