← China railway records
Airport railway

Qingdao Luiting

Metro link to former airport

Recorded status: Operational

Awaiting verification. The recorded status and details may be historical. Check the operator’s current information before relying on this record.

Overview

Line 1 opened to the airport at the end of December 2020: the airport reportedly closed in August 2021 with the opening of a replacement at Jiaodong. At some point the line will be re-numbered Line 7.

Go further with IARO

Members can read the additional reference notes and explore planned schemes and cargo connections.

Explore membership → · Member login →